The Future
“Next ledger entry: March 2027 · Hillview Park · 36-mo soil-core lattice · Pangolin co-sign · attestation expected. The line is already drawn.”

The Hillview soil-carbon CoP is in its first 36-month CER ERF cycle (2024 baseline → indicative 36-mo verification window 2026–2027) with co-sign engagements lodged with Pangolin Associates and Southern Cross University. The Pejar catchment water-quality CoP is the planned vertical 2 — scoped on the same custodian roster, indicative method instance under the Nature Repair Market. The roadmap reads: if carbon, then biodiversity; if biodiversity, then catchment. Forward-looking; subject to method approvals and the disclosures in the IM.
Hillview soil carbon · 36-mo cycle in progress · indicative completion 2026–2027.
Baseline 2024 soil core lattice · intervention rotational grazing × diverse-species pasture · tolerance ±0.10% SOC at 30 cm. External co-sign engagements: Pangolin Associates + Southern Cross University. CER attestation: in-cycle, not yet issued.
Outcome metric: tCO2e/ha/yr. Audit cadence: 12-mo and 36-mo cores; drone NDVI quarterly. Settlement against the line is contingent on the issued attestation.
If carbon, then biodiversity. If biodiversity, then catchment.
Vertical 2 (biodiversity uplift · Nature Repair Market · planned): same custodians, same auditors envisaged, new outcome class. The project plan calls for vertical 2 scoping in the cycle following Hillview attestation; capital cost expected to be a fraction of vertical 1 because the chassis is paid for.
Vertical 3 (catchment quality · Pejar · indicative target 2027): same seven titles, new method file, same Design / Verify / Value / Connect rails. Subject to method approval and capital availability.
March 2027 · Hillview · 36-mo cores · attestation expected. The next line is already drawn.
Forward-looking · indicative · RG 170.
Forward-looking statements about subsequent verticals are subject to assumptions disclosed in the IM and are not commitments.
Wholesale only. Capital is at risk. Past performance is not indicative of future results.
Land v1 · in cycle · indicative window 2026–2027. Subsequent verticals planned · indicative · RG 170.
Stripe-Press editorial · roadmap small-multiples grid — five columns (Land / Water / Carbon / Biodiversity / Yield) × three rows (Design / Verify / Value); solid cells = in-cycle, hairline cells = planned/indicative; one gold underline marking the live cohort.
One chassis. One attestation pending. The next ledger entry has a date.